Prog 101 Update
Shannen Durphey
shannen at mcn.net
Thu Apr 2 14:52:54 GMT 1998
Bruce Plecan wrote:
>
> On the 747 project another set of tables has been confirmed,
> in reveiw, for those who've missed it.
>
>
> There are a couple critical ones we have yet to find, ie
> Knock retard decay (if there is)
>
Knock retard is handled by the esc box mounted on the right
side of the intake manifold.
it intercepts computed timing signal from 747
TCC conditions (TPS, VSS ?)
> EGR, timing and fuel corrections
> Target AFR for closed loop
> Closed loop function parameters
> Injector size (?)
>
>
> No worries mate
> Bruce Be sure to include at least two Cone Shaped Hats
> in your summer wardrobe collection (I need the
> royalties) LOL
> /\
> /C \
> / S \
> /____H_\
( _\
( @
( \
( _\
( __}
( }
More information about the Diy_efi
mailing list